ALGI

Hydraulic Systems · Lift Components

Chronic

1929 The company was founded by the master electrician Alfred Giehl
1930 The first products - car fuses, test lamps, air pumps, etc. were exhibited in a showroom of 25 m2 at Schwalbacherstrasse 51 in Eltville
1956 Production of the first construction machine cylinder
1959 Production of the first hydraulic cylinder for Stahl in Munich
(now ThyssenKrupp)
1959 Construction of a new production plant at Schwalbacher Str. 51 - by 1975 the production area was expanded to 6,000 m2
1963 Production of the first in-house designed honing machine for machining piston rods
1964 Design and production of the first synchronized telescopic cylinder for elevators
1967 Assembly of the first aggregate with a mechanical valve block from URACA
1975 Construction of the first production plant on the company's premises in Kiedrich - a production area for manufacturing one-stage cylinders and multi-stage synchronized telescopic cylinders, as well as an extension for the assembly of power units
1976 Development of the mechanical valve block series AZSTB
1980 Design and assembly of the first direct car frame
1987 As of the late 80s, car frames are produced exclusively in Schwalbacherstrasse
1990 Dedication of the theoretical and practical training room with an
area of 250 m2 for internal staff and customers training
1991 Until 1991, the company's premises in Kiedrich were expanded step by step to a production area of approx. 18,000 m2. The construction of production hall 2 began in 1981, production hall 3 in 1987, and production hall 4 in 1989.
1995 Completion of the production plant III for the assembly of elevator cabins with an area of 1,500 m2
1997 First QM certificate in accordance with ISO 9001 was issued
1997 Shipment of the first power unit with a controlled valve block AZRS
1998 Construction of the Administration Building at Plant II in Kiedrich
2006 Modernisation of storage space in the basement of hall 4 allows for the production of containers for the various power units in Plant II
2007 Completion of the new shipping hall expands the production and storage space to approx. 24,000 m2
2007 Shipment of the first frequency-controlled hydraulic drive
  • Picture gallery